What the technical file is
The technical file is the set of documents showing that a machine meets the essential health and safety requirements. The manufacturer prepares it before placing the machine on the market. It is not handed to the customer, but it must be kept ready: if the authorities ask for it, you have to produce it.
From 20 January 2027 Regulation (EU) 2023/1230 applies, replacing the Machinery Directive 2006/42/EC. The content of the technical file is set out in Annex IV, Part A.
What goes into it, in practice
The full list is the text of Annex IV, Part A. For a special machinery builder, the file in practice gathers:
- A description of the machine and its intended use.
- General and detailed drawings and diagrams of the control circuits, with the calculations needed to understand conformity.
- The risk assessment and the measures taken to eliminate or reduce the risks.
- The standards and specifications applied.
- Test reports, for example FAT and SAT.
- Instructions for use and a copy of the EU declaration of conformity.
- Safety software. On a reasoned request from the authorities you must be able to provide the source code or programming logic (Annex IV, Part A, point m).
- For machines with sensors, remote control or autonomous behaviour, also data, development, testing and validation (Annex IV, Part A, point n).
What changes with Regulation 2023/1230
- Kept for at least 10 years after placing on the market or putting into service, together with the EU declaration (Art. 10(3)).
- EU declaration following Annex V, Part A. It can accompany the machine or be reachable from an address or QR code given in the instructions, online for at least 10 years (Art. 10(8); Art. 21).
- Digital-only manual allowed under the conditions of Art. 10(7): downloadable and printable, online for at least 10 years, with a free paper copy for anyone who asks at the time of purchase.
- Partly completed machinery: declaration of incorporation and assembly instructions (Art. 11; Art. 22; Annex V, Part B).
- Substantial modifications: whoever substantially modifies an installed machine takes on the manufacturer's obligations for the parts affected (Art. 3, point 16; Art. 18).
Want to see where you stand? The free Machinery Regulation checklist (in Italian) has 20 questions, each with its reference article.
Build it during the project, not afterwards
A technical file put together in a rush before delivery always has gaps: the right revision of a drawing, the result of a test, the signature on a training record. It pays to file each document when it is created.
- Open the file with the project, in its own folder next to design, drawings, purchasing and tests.
- Record FAT and SAT as you go: a failed result opens a non-conformity, and its closure stays on record.
- Keep the safety software versions project by project.
- Minute the training at handover, with the attendees' signatures.
- Publish the manual and declaration where the customer finds them through a QR code on the machine, for at least 10 years.
How Quadra does it
In Quadra the declaration of conformity is generated from the data in the project's CE file. The user manual is published online with the QR code on the machine and stays available for at least 10 years. Safety software versions are kept project by project. Operator training at handover is recorded, attendees sign with a finger, and the minutes go into the technical file and onto the machine portal. For series machines, the declaration and CE plate are per serial number.
This guide is a reminder, not legal advice: for real cases the official text of Regulation (EU) 2023/1230, as corrected, and the opinion of an expert or notified body prevail.